The One With The 8 Person Sewage Treatment Plant
- Martin Atkin
- Jan 10, 2023
- 1 min read
We install lots of different sizes of sewage treatment plants, and this project was one where an 8 person treatment plant was required.
We had to undertake a septic tank instal suitable for 8 people, and the treatment plant needed to be installed in a small area, to the side of the driveway that led to the property. All drainage pipes had to be set in place and connected to run from the septic tank up to the house. In order to properly accommodate the pipework, certain points of the dig were six feet below driveway level, and because pipes had to be laid to the side of the drive, use of suitable props and temporary restraining walls were required to make the dig safe.
Once the septic tank and pipe work were in-situ, we were able to use an aggregate mix to fill the spaces around the tank and pipes, before levelling out with top soil that was lifted when first making space for the equipment.
The customer now has a fully functioning, safe, quality septic tank that will last the duration.
Here’s how to do it:
Head to your Members Page
Search for the member you want to make a writer
Click on the member’s profile
Click the 3 dot icon ( ⠇) next to the Follow button
Select Set as Writer.




















Comments